With the increase in export demand, organization (our client) was not able to meet the increased sale demand and thus resulting loss of sales. Client was planning to enhance the capacity by addition of new setup. Our team was called for new set up design. Detail capacity study was conducted and ideal capacity was calculated. All possible reasons were listed down and linked with the loss of production. Key control points were decided for each reason of loss. Projects implemented to prevent the loss of production
Productivity Improvement
Bussiness Profile
Our Client is a leading high tensile fastener manufacturer for automotive segment with a group turnover above USD 75 million annually
Business Challenge
With the increase in export demand, organization (our client) was not able to meet the increased sale demand and thus resulting loss of sales. Client was planning to enhance the capacity by addition of new setup. Our team was called for new set up design
Our Intervention
- Detail capacity study was conducted and ideal capacity was calculated
- All possible reasons were listed down and linked with the loss of production
- Key control points were decided for each reason of loss
- Projects implemented to prevent the loss of production
- DWM developed to sustain the gain
Results
Productivity
70%
Increased byCost Saving
6 Cr
INR(Additional plant and machinery cost)